A Practical Guide to Design Practitioner Registration in NSW
The NSW Design and Building Practitioners (DBP) scheme sets out who must be registered when preparing designs for certain types of buildings and what responsibilities come with that registration. Only the person who signs off and declares that a design meets legal requirements must be registered. While a team may contribute to preparing drawings or documents, the supervising designer (the person lodging the formal declaration) is the one who must hold registration, ensuring a clear line of accountability.
Registration is required when working on certain “regulated buildings,” including class 2 apartment buildings, class 3 hotels and boarding houses, and class 9c aged care buildings. This includes mixed-use buildings that contain any of these classes. You must register if you prepare regulated designs and sign the design compliance declaration, if you coordinate designs as a principal design practitioner, or if you are an architect or engineer from interstate working under mutual recognition.
Regulated designs relate to key building elements such as structure, waterproofing, fire safety, or drainage, or any design that relies on a performance solution. The registered design practitioner must ensure their design complies with the Building Code of Australia and integrates with the other designs on the project. The practitioner must only work within the limits of their registration class.
Before Construction Begins
Before building work can start, a registered design practitioner must prepare the construction-issued regulated designs for any part of the work involving a building element or performance solution. Once the design is ready for use on site, they must complete a design compliance declaration confirming the design complies with the BCA and fits properly with other relevant designs. A certifier cannot issue a construction certificate or complying development certificate without these documents.
These designs and declarations must be lodged on the NSW Planning Portal by the building practitioner or an “appropriate practitioner,” such as a registered design practitioner or principal design practitioner. Lodgement must occur before construction begins. On larger or more complex projects, a principal design practitioner may be appointed to coordinate all designs and declarations. After everything is lodged, the building work may start. The Building Commission NSW may inspect the site or review the lodged designs, and any issues must be rectified before work can proceed.
During Construction
If the building practitioner makes a change that affects a building element or a performance solution after construction has started, a registered design practitioner must prepare a new regulated design and complete a new compliance declaration. These must be lodged within one day. Work may need to pause while updated documents are prepared. Variations that do not affect a building element or performance solution do not require a design declaration but must be recorded by the building practitioner.
Before completion
As the project nears completion, and before an occupation certificate can be applied for, the applicant must give the building practitioner at least 14 days’ notice. If a principal design practitioner is involved, they must also receive 14 days’ notice to complete their principal compliance declaration. The building practitioner must then lodge a building compliance declaration confirming the work has been carried out according to the lodged designs. Only a registered building practitioner can make this final declaration.
This scheme helps ensure that building work is carried out safely and in line with properly checked, compliant designs. Knowing who must be registered, when declarations are required, and how documents must be lodged helps prevent delays and protects the integrity of the construction process. If there is any uncertainty about whether your role falls under the scheme, it is advisable to seek guidance early to avoid issues later in the project.
Papallo Kouchoo Lawyers are here to assist you and guide you through your construction project.
Photo by Daniel McCullough on Unsplash
Stay Fully Covered: How HBCF Works and What Homeowners Must Do to Comply
`
The Home Building Compensation Fund (HBCF) protects NSW homeowners if their builder cannot finish the work or fix defects because they have become insolvent, died, disappeared, or had their licence suspended for failing to comply with a Tribunal or Court money order. When one of these events occurs (called a trigger event), you may be able to claim under the HBCF policy issued for your project.
Any residential building work over $20,000 must be covered by HBCF insurance before the builder starts work or takes any payment, including a deposit. After the builder is assessed, they receive a Certificate of Eligibility and then a Certificate of Insurance must be issued specifically for your property.
As a homeowner, you must receive this Certificate of Insurance before work starts. It must show your name, the builder’s exact legal name, your site address, the contract price, and a description of the work. You can check the certificate and the builder’s licence online. HBCF applies to most homes, including strata buildings up to three storeys.
If a trigger event occurs, HBCF may help with losses such as:
- Failure to start the work (loss of deposit)
- Failure to finish the work (up to 20% of the contract price)
- Major defects (covered for six years from completion)
- Non-major defects (covered for two years from completion)
If defects are discovered in the last six months of these periods, you have an extra six months to make your claim. The maximum cover is $340,000 for most current policies, and the protection also benefits future owners of your home unless a previous claim has used up the cover.
To comply with the policy and protect your right to claim, you must notify icare HBCF as soon as you become aware of any defect, loss, or problem—usually by lodging a Loss Notification Form. This must be done within the required timeframes, generally within six months of becoming aware of the issue. Even after notifying HBCF, you must still take reasonable steps to pursue the builder until a trigger event occurs.
By making sure your builder provides the correct insurance, keeping copies of your documents, notifying HBCF promptly, and continuing to follow the required process, you can ensure you remain protected under the HBCF scheme.
Be on time: Expert Evidence and the Danger of Personal Costs Orders
Delay in serving and filing evidence can be a dangerous thing sometimes. The case of The Owners – Strata Plan No. 94784 v Mirvac Projects Pty Ltd (No 3) [2024] NSWSC 936 is informative in this regard.
In the matter the plaintiff sought the leave of the Court to rely on expert reports served very late in breach of a “Guillotine order”. The plaintiff’s had effectively bought a motion to rely on further late expert evidence. The plaintiff solicitor was ordered to ‘show cause’ why he should not personally meet the costs of the motion and why he should not charge, his client, the plaintiff, for those costs. A more junior solicitor for the plaintiff had initially attempted to explain the delays in serving the reports as being due to ‘competing commitments and other general reasons’. However, for various reasons including the timing of the retainment of the experts the Court did not accept that initial explanation and so, it was left with the supervising lawyers to show cause. Fortunately, the further evidence showed that the delay was not caused by solicitors and the Court (Stevenson J) did not find grounds for personal costs orders.
It should always be remembered that evidence especially in the form of expert reports, should be lodged on time and every effort should be made to ensure that the case management timetable imposed by the courts and tribunals is met and abided by, especially where ‘guillotine orders’ are in place (these orders mandate the lodgement of material by a certain date – if there is a breach, the party responsible needs to provide an explanation to the court in order to have that evidence permitted).
Our solicitors at Papallo Kouchoo are experts in ensuring that your matter is conducted with efficiency and you receive the right advice, at the right time.
If you have any questions, please do not hesitate to contact us for a professional free consultation.
Understanding What Is a “Major Defect” Under the Home Building Act
When someone makes a building defect claim after the two-year warranty period for non-major (minor) defects has already passed, one of the first and most important questions is whether the issue qualifies as a “major defect” under the Home Building Act 1989 (NSW) (the Act). This is critical because major defects have a six-year warranty period, while all other defects only have two years. If a defect is not correctly classified as a major defect, the claim may fail simply because it is out of time for a minor defect.
A major defect is defined in section 18E of the Act. In simple terms, it is a defect in a major element of the building that arises from things like faulty workmanship, bad materials, defective design or failure to meet the structural requirements of the National Construction Code. To be considered “major”, the defect must either make the building (or part of it) unable to be lived in or used properly, or be likely to cause serious damage, destruction, or even a threat of collapse. The law also includes certain safety-related defects, such as combustible external cladding on high-rise buildings, or the use of banned building products as major defects.
A major defect must also involve a “major element” of the building. These include structural components such as foundations, walls, floors, beams and roofs, as well as fire safety systems and waterproofing. The Tribunal (or NCAT) has repeatedly confirmed that waterproofing is a major element, and it should be understood in a broad, practical sense, not a narrow technical one.
A common misunderstanding is that a defect must already be severe or close to causing significant damage before it can be classed as major. That is not the case. The Supreme Court in, Stevenson v Ashton [2019] NSWSC 1689, has confirmed that a major defect does not need to be “imminent”, “dire”, or already causing major harm. It is enough if the defect is likely to cause one of the serious outcomes listed in the Act.
In deciding whether a defect is a major defect usually involves a two-step process: first, determining whether the defect affects a major element of the building, and second, deciding whether it has caused or is likely to cause serious consequences.
It is also important to consider how long the defect has existed, whether it has already caused any damage, and the expected lifespan of the materials involved. Water ingress, even if only during heavy rain, is often taken seriously because of the risk of future damage, mould or structural problems.
Understanding what counts as a major defect is important because of the strict time limits in the Act. The definition is broader than many people expect, especially when it comes to waterproofing and defects that may worsen over time. Knowing these principles can help homeowners and owners corporations protect their rights and take action within the required timeframes.
If you’re concerned about possible defects or uncertain about your rights, reach out to us for a free professional consultation – we’re here to help.
Checklist: Could This Be a Major Defect?
A simple guide for homeowners and strata committees
Use this checklist to help work out whether a building problem may qualify as a major defect. This does not replace expert advice, but it helps you recognise the signs early.
1. Does the problem affect a major part of the building?
Tick any that apply:
☐ Structural parts (foundations, walls, floors, beams, columns, roof)
☐ Waterproofing (bathrooms, balconies, roofs, planter boxes, basement walls, etc.)
☐ Fire safety system (alarms, sprinklers, hydrants, smoke control systems)
☐ Combustible external cladding (especially on high-rise buildings)
☐ Major structural supports in garages, basements or retaining walls
If you ticked any of these, continue to step 2.
2. What caused the problem?
Tick any of the following you suspect or have been told:
☐ Poor or faulty workmanship
☐ Bad or unsuitable materials
☐ Defective design
☐ Not meeting the National Construction Code
☐ Use of unsafe or banned building products
If you ticked any of these, continue to step 3.
3. Could this defect cause serious consequences?
Tick any that apply:
☐ The area is hard or unsafe to use
☐ Water is entering the building
☐ Cracking or movement appears to be getting worse
☐ Parts of the building feel unstable
☐ There is mould, dampness or water staining
☐ You are worried about collapse or major damage
☐ The issue could spread or worsen over time
☐ The defect might stop the building being used normally in the future
If you ticked one or more, the defect may be a major defect.
4. What should you do next?
If you ticked items in all three sections (1, 2 and 3), your issue could be a major defect, and you may have six years from the building’s completion date to make a claim.
You should consider:
- Getting an expert report (engineer, building consultant, or waterproofing specialist)
- Seeking legal advice if the claim period may be running out
- Acting promptly to avoid losing your rights
Important Reminder
A defect does not have to be severe right now to be a major defect.
It only needs to be likely to cause serious problems in the future if not fixed.
If you’re concerned about possible defects or uncertain about your rights, reach out to us for a free professional consultation – we’re here to help.
Protecting your licence at the Tribunal
Our lawyers have significant experience in applying for, or defending license matters in NSW before various bodies, including building licenses at Fair Trading.
Applying for a licence or trying to defend your licence is not an uncomplicated matter and can become very involved.
Careless mistakes or overlooking various questions, or not including relevant material and documents, can cause you a lot of headache when applying for your trade or other licence.
For example, sometimes you may forget to declare various matters, or make the wrong declarations; sometimes you forget to give proper reasons for why something has happened or you may give reasons which don’t really explain your position properly (e.g. you forgot to declare that you were a director of a company which was liquidated, and/or give proper reasons which lead to its insolvency). Overlooking important matters like that can sometime make or break your licence, and your career.
Sometimes the authority will write to you and ask you to explain and ‘show cause’ why you should be given a licence, or why your licence shouldn’t be taken away.
It is crucial that you have experienced lawyers who can support you in that process and make sure that ‘no stone is left unturned’ to try and preserve your most precious resource and the thing on which puts bread on your table: your licence!
Our lawyers can help and guide you, both when you’re applying for a licence (say a builder’s licence) or when you’re asked to ‘show cause’ why your licence shouldn’t be taken away.
We have extensive experience dealing with many licensing problems, including when a licence is danger because of a criminal conviction or some other matter which an authority can use to deem you to be unfit to hold the licence.
At Papallo Kouchoo Lawyers, we do our utmost to uphold your rights and to ensure that your career runs smoothly and that your licence is protected.
If you have any questions, please do not hesitate to contact us for an obligation free professional consultation.
Upholding your rights in courts and tribunals
Our lawyers will not hesitate to uphold your rights with fear or favour. We’ve done this continually for 60 years – the length of time that our firm has been in existence.
It is important that lawyers pay careful attention at every stage of the litigation including in what are known as ‘interlocutory’ steps (or the in the intermediate hearings before the final hearing). Some of these ‘intermediate’ hearings can for example make or break your case. The example of the interesting and controversial case of R v Kahtan ABDUL-WAHAB No 3 [2025] NSWLC is informative.
The case was conducted in the Local Court of NSW, and one of the main issues arose at an interlocutory stage, where the constitutionality (or legality) of a certain provision of the Crimes Act 1900 NSW was essentially a question which needed to be answered.
The Local Court may have effectively had no choice but to determine that ‘constitutionality’ (perhaps it could have referred (or ‘removed’) the matter to a court of inherent jurisdiction or a higher court, of its own motion but it did not — it did not refer or remove the matter to the High Court or to the Supreme Court of NSW).
The Court used the doctrine of ‘necessity to do justice as between the parties’ (Lambert v Weichelt (1954) 28 ALJ 282) to decide the constitutionality of a provision of a legislative instrument.
The essential fact is that it seems that no objection was taken during the course of the hearing for the accused in relation to that course with the Court itself saying that the “constitutional issue was not removed to the High Court by any of the parties under s 40 of the Judiciary Act (Cth) 1939.”
It is very hard to envisage that the Court had the jurisdiction to decide these questions without reference.
Cases such as Lambert v Weichelt seem to imply that the ‘necessity to decide constitutional questions’ arises only when those questions are within their own purview (i.e. when the jurisdiction exists for these courts to decide such questions).
It seems to us that the accused should have perhaps objected.
The lawyers at Papallo Kouchoo do our utmost to uphold our clients’ rights under the law, without fear, or favour.
If you have any questions, please do not hesitate to contact us for an obligation free professional consultation.
Malicious Prosecution
Some litigants at times commence proceedings in response to a ‘prosecution’ which they believe, should have never been brought against them, after the case against the client is dismissed.
This happens mainly in the criminal jurisdiction where the aggrieved client would like to institute proceedings against the police or the state, but it can also happen in civil proceedings where some clients are intent on bringing matters against former claimants for “maliciously prosecuting a case”.
Again, because of the exorbitant costs of these kinds of claims (‘counter-claims’ actually) we always urge caution and carefully examine every detail of the original case brought against our client, before we provide advice that a client can proceed on the basis of reasonable prospects.
For example, in the case A v NSW in the High Court (2007), the High Court held that when a “a plaintiff alleges that a prosecutor acted maliciously, that is, for an improper purpose, not for the purpose of carrying the law into effect, the circumstances of the prosecution may determine the nature of the case the plaintiff will seek to make.”
In other words, the various circumstances surrounding the original case will need to be very carefully examined and a decision is to be made that the case was brought maliciously in light of ‘all the circumstances,’ before we can say that the case will have good and reasonable prospects of success.
The ‘circumstances’ then are all important, this is because very simply, a claimant against the client in the original case (whether they be police or a civilian claimant) will not tell the client, that its original case against the client was a ‘malicious prosecution’. Hence the careful analysis of all the facts (and in detail) is an absolute must.
The moral of the story is (as is the usual case) that you need to meticulously examine each of the facts and ensure that you leave no stone unturned before commencing any proceedings.
At Papallo Kouchoo Lawyers, we do our utmost to ensure that there are good returns in relation to any case, and we do that before we commence proceedings, ensuring to uphold your rights to the maximum extent of the law.
If you have any questions, please do not hesitate to contact us for an obligation free professional consultation.
Transfer of Building & Strata Claims between NCAT and Courts
Clients will need to be extremely careful as to where a building and construction claim is commenced.
NCAT (or the Tribunal) has primary jurisdiction in relation to many homebuilding matters.
At times, a client may commence a homebuilding claim in a court and then be ‘pulled’ into NCAT at great cost and expense.
We have had cases where there were multiple proceedings on foot (one in NCAT for example and one in a court, e.g. the Supreme Court).
Careful thought needs to be given as to whether or not a matter needs to be transferred from a court to NCAT or in more limited cases, vice versa. Sometimes respective questions in relation to one matter can stay in two jurisdictions if the court and NCAT have different jurisdictions. A transfer application can also be made when either a court or NCAT has the full jurisdiction to hear all matter related questions.
This is where things can at times end in disaster.
For example, when commencing proceedings, litigants need to be very careful to ensure that there are no claims commenced (by them or the other side) in another jurisdiction and, in the least, that different questions are before those forums with each having a separate and distinct jurisdiction to hear the separate questions before them.
In one case, The Owners – Strata Plan No 47035 v Athens [2025] NSWSC 1588, the parties had previously transferred the matter into the Supreme Court (from the Local Court), and had spent about five years there (since 2020). During the final hearing however, Justice Elkaim noted that the Supreme Court may not have had the requisite jurisdiction, because a similar case, on similar issues, was commenced in NCAT before the Supreme Court matter commenced. Justice Elkaim saw no other choice but to transfer the matter to NCAT.
It is in cases like this, that the enormous cost and time of the matter, costs which have been already spent in one jurisdiction, may all essentially be for nothing.
At Papallo Kouchoo Lawyers, we do our utmost to ensure that we do our detailed ‘due diligence’ before we commence proceedings, ensuring to uphold your rights to the maximum extent of the law.
If you have any questions, please do not hesitate to contact us for an obligation free professional consultation.
Contract Termination is a very serious matter
Before terminating any kind of contract, the underlying requirements have to be present, otherwise the other side can claim ‘repudiation’ on your part and sue you for damages.
For example, in building or technology contracts, contractual breaches may be alleged by the contractor causing delays or making unauthorised variations, missing deadlines, claiming unjustified progress payments, or performing the work negligently.
These elements will have to be proved and will need to amount to ‘substantial breaches.’ For example, expert evidence will need to be provided to show negligent work.
If the contract is terminated without requisite elements of such allegations being proven (or being provable), then it is possible that the other side can blame the terminating party, or or some other factor (e.g. inclement weather) in respect of the alleged breaches, and claim ‘repudiation’ (i.e. none performance of the contract basically) and the damages.
Parties who want to terminate sometimes also classify any alleged non-performance as a ‘repudiation’ and thereafter ‘accept’ the termination.
Again, we emphasise that many such attempts are premature. In order to succeed in such claims parties will need to show that the ‘repudiating’ party conduct clearly showed an unwillingness or inability to perform essential contractual obligations.
If you terminate, it is not unusual for the other party to claim substantial damages for ‘wrongful’ or unlawful termination. This is a great risk for parties invoking termination prematurely.
It is also to be remembered that any damages need to be based on adequate and proper evidence including expert reports which show that the damages were the direct result of say, negligence of a contractor.
The moral of the story is that you need to be very careful before you terminate your contracts. There are many potential traps and you will need adequate advice before you take that important step.
At Papallo Kouchoo Lawyers, we do our utmost to uphold your rights and to ensure that your contractual rights are safeguarded.
If you have any questions, please do not hesitate to contact us for an obligation free professional consultation.